About us Furnaces Hydrometallurgy Steel Structure Projects Contact us

-Hydrometallurgy-Copper

-Pictures

-Blast Furnace

Copper Hydrometallurgy

    Process No.1: Copper sulfide concentrate roasting - leaching - electro deposition

     Process No.  2: Leaching - solvent extraction - electro deposition

     Process No.  3: Ammonia leaching - solvent extraction - electro deposition

     Processing flow and parameter are Tailored based on the demands from customer and the ore condition.

    Copper hydrometallurgy have notable predominance in the poor-value ore, ore tailing or spent ore that is hard to be treated by pyrometallurgy.

    WECO undertake the project consultancy, engineering, equipment fabrication, construction, erection, maintenance, …

    Solid-Liquid separation technology and equipment

    Solvent extraction technology and equipment

     Electrical reaction technology and equipment

Nickel Smelter

Lead Smelter

 

Copper Smelter

 

Zinc Smelter

 

Aluminium Smelter

-Flash Furnace
-Fuming Furnace
-Reverberatory Furnace
-Converter for Blowing
-Rotary Dryer and Kiln
-Anode Furnace
-Electric Furnace
-Heat Treat Furnace
-Copper
-Rare earth
-Niobium and Tantalum
-Zirconium and Hafnium
-Structural Design
-Fabrication
-Erection
Address:
Rm. 308, Building E, Jinfenghe Business Garden, No. 8th Xinwai Street, Beijing 100088, China
Tel:
86 10 62081426
Fax:
86 10 62356450
Email:
sales@west-equipment.com
Website:
www.west-equipment.com